1000-8000tph Cement Production Line

Product Details
Application: Construction, Mineral Operation
Certification: CE, ISO
Customized: Customized
Manufacturer/Factory, Trading Company
Gold Member Since 2006

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
Overseas Services
The supplier provides overseas services and supports countries including Philippines, Indonesia, Tanzania.

Overseas service content includes Debugging, Maintain, Repair, Training, Equipment Installation.
to see all verified strength labels (19)
  • 1000-8000tph Cement Production Line
Find Similar Products

Basic Info.

Model NO.
LM130K, LM150K, LM170K, LM190K, LM220K
Automatic Grade
Automatic
Spare Parts Supply
for Whole Year
Test&Installation
Engineer Assigned
After-Sale Service
for Whole Using Life
Export Markets
Global
Transport Package
Container, Nude Packs, in Bulk
Specification
CE, ISO
Trademark
Zenith
Origin
Shanghai
HS Code
8474209000
Production Capacity
80sets/Month

Product Description

1000-8000tph cement production line 

Production Process of Cement Production Line

The whole production process of cement is generally as follows: Cement Crusher and homogenizing-- Preparation of raw material -- Raw material homogenization -- Preheat decomposition -- The burning of cement clinker -- Cement grinding mill -- Cement Packaging Among all these procedures, we will introduce to you the cement crusher process and cement grinding mill process in details
1000-8000tph Cement Production Line

The Major Equipment of Cement Production Line:


Cement production line includes the following machines such as vibrating feeder, jaw crusher, impact crusher, cement ball mill, lifer, preheating system, cement rotary kiln, rotary dryer and packing machine and so on.
1000-8000tph Cement Production Line

cement production line Application

cement production line is widely used in many industrial, such as building, chemical, chemical fertilizer, metallurgy, mining, nonmetal, abrasive, bearing materials, ceramic, steel, thermal power, bricks & tiles, coal industry, etc. cement production line can grind these materials which are 9 or less on the Mohs scale, and moisture is below 6%., and they should be nonexplosive and nonflamable mining materials. The final size can be adjusted from 30 to 400 meshes easily. There are thousands materials our machine can grind. The typical materials are cement (raw meal and cement clinker), quartz, feldspar, calcite, gypsum, limestone, dolomite, graphite, fluorite, aedelforsite, phosphate ore, fused calciummagnesium phosphate, carbamide, electrolytic manganese metal, ferromanganese, coal, gangue, slag, zirconium, steatite, granite, orthoclase, marble, barytes, ceramic.

cement production line technical data:
 
Model LM130K LM150K LM170K LM190K LM220K LM130M LM150M LM170M LM190M LM220M LM130N LM150N LM170N LM190N LM220N
Wheel diameter(mm) 1300 1500 1700 1900 2200 1300 1500 1700 1900 2200 1300 1500 1700 1900 2200
Output (th) 10-30 13-40 18-57 23-72 36-110 10-15 16-22 20-28 26-35 35-50 5-14 7-20 8-27 9-30 18-55
Finish fineness µm 170-45 170-45 170-45 170-45 170-45   170-45 170-45 170-45 170-45 170-45
Mesh 80-325 80-325 80-325 80-325 80-325   80-325 80-325 80-325 80-325 80-325
Coal powder fineness (R0.08)   5-20% 5-20% 5-20% 5-20% 5-20%  
Coal powder moisture (%)   <1% <1% <1% <1% <1%
End product moisture (%) ≤1% ≤1% ≤1% ≤1% ≤1%   ≤1% ≤1% ≤1% ≤1% ≤1%
Grinding material particle size D80 (mm) <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10 <10
Grinding material max feed size(mm) <38 <40 <42 <45 <50 <38 <40 <42 <45 <50 <38 <40 <42 <45 <50
Moisture of grinding material not to dry (%) <4% <4% <4% <4% <4%   <4% <4% <4% <4% <4%
Matieral moisture of into mill (%)   <15% <15% <15% <15% <15%  
Moisture of grinding material need to dry (%) 4%-15% 4%-15% 4%-15% 4%-15% 4%-15%   4%-15% 4%-15% 4%-15% 4%-15% 4%-15%
Into mill air temperature (ºC) <350 <350 <350 <350 <350 <350 <350 <350 <350 <350 <350 <350 <350 <350 <350
Out of the mill air temperature (ºC) 70-95 70-95 70-95 70-95 70-95 75-95 75-95 75-95 75-95 75-95 70-95 70-95 70-95 70-95 70-95
Raw coal hardgrove grindability index (HGI)   >55 >55 >55 >55 >55  
Main motor power (kw) 200 280 400 500 800 185 250 315 400 500 200 280 400 500 800
Contour dimension Length (mm) 5520 6550 7170 7580 8080 5520 6550 7170 7580 8080 5520 6550 7170 7580 8080
Width (mm) 2500 3070 3460 3320 4660 2500 3070 3460 3320 6700 2500 3070 3460 3320 4660
Height (mm) 7060 7560 8300 8960 9020 7060 7560 8300 8960 9020 7060 7560 8300 8960 9020

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier